East wall fully operational. Two ceiling fans installed and working (the two with lights in em, above the stage/front door which is linked up to the switch, and one above the bar, which is also hooked up to the switch that works now).
Need some more material before our next go, but next time we're gunna get that last ceiling fan up and add a few switches so the lights aren't all linked only to the breakers.
Also I got some breaker type fuses that pop instead of blow. They're more expensive but dont need to be replaced.
Paul decided not to charge us a goddamn cent, and said he'd be come back to help out again whenever he has time.. What a dream babe. We owe him at least an invite to the free beer and pizza party. Tyler was a huge help as well.
Anyways, successful day. :)
Sent from my Huawei Mobile
Brendan Plummer <brendan.plummer at gmail.com> wrote:
>_______________________________________________
>Blacklabcollective mailing list
>Blacklabcollective at lists.resist.ca
>https://lists.resist.ca/cgi-bin/mailman/listinfo/blacklabcollective
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.resist.ca/pipermail/blacklabcollective/attachments/20150722/8cc0cf8c/attachment.html>
More information about the Blacklabcollective
mailing list